What our clients are saying about us...
Click links below

RENOVATION BEQ 241, POINT MUGU, FINAL

MUTLI-BATTALION OPERATIONS CENTERS, TWENTYNINE PALMS, FINAL

MARINE CORPS RECRUIT DEPOT (MCRD), SAN DIEGO, FINAL

BACHELOR ENLISTED QUARTERS (BEQ) PACKAGE 5, CAMP PENDLETON, FINAL

BACHELOR ENLISTED QUARTERS (BEQ) P-1251 & P-1254, CAMP LEJEUNE, INTERIM

PHASE 3 OF THE REGIMENTAL MAINTENANCE COMPLEX, AREA 43, FINAL

RECRUIT BARRACKS P-1069, CAMP PENDLETON, FINAL

STARSHIP BARRACK 5955 RENOVATION, FORT SILL, FINAL

ARMED FORCES RESERVE CENTER, FORT SILL, FINAL

CONSTRUCT NEW AIR PASSENGER TERMINAL (P-057) AT MCAS MIRAMAR N68711-01-D-6223/0004

DESIGN-BUILD FAMILY HOUSING PROJECT, ADOBE FLATS (H-370), MARINE CORPS AIR GROUND COMBAT CENTER, TWENTY-NINE PALMS, CA N68711-99-D-6654

ACADEMIC TRAINING FACILITY P-621, MARINE CORPS AIR GROUND COMBAT CENTER, TWENTYNINE PALMS, CA N68711-01-D-6217

ARMORED VEHICLE WASH PLATFORM FINAL EVAL

YUMA AIR TRAFFIC CONTROL TOWER FINAL EVAL

YUMA AIR TRAFFIC CONTROL TOWER INTERIM

BEQ P-438 KANOEHE BAY, HAWAII-FINAL EVAL

ENGINEERING SVC CTR PORT HUENEME FINAL EVAL

BAE SYSTEMS

BEQ P-044, AREA 13, CAMP PENDLETON

BEQ P-074 CAMP PENDLETON

BEQ P-410/415 MCAS YUMA, INTERIM

BEQ P555 SAN CLEMENTE ISLAND, FINAL EVALUATION

BEQ & DINING FACILITY P-707, SAN CLEMENTE ISLAND, FINAL EVAL

BEQ DEL MAR SITE, MCB CAMP PENDLENTON, CA

CHILD DEVELOPMENT CENTER, FORT IRWIN, CA

CHILD DEVELOPMENT CENTER, SAN ONOFRE, MARINE CORPS BASE, CAMP PENDLETON, CA

NAVAL CONSTRUCTION TRAINING CENTER, PORT HUENEME, CA

FAMILY HOUSING PROJECT, PHASE I, II, III, HALE MOKU, PEARL HARBOR, OAHU, HI

FROM THE STATE OF CALIFORNIA, DEPT OF INDUSTRIAL RELATIONS CAL/OSHA CONSULTATION SERVICE, FRESNO, CA

INDOOR FITNESS CENTER, MCB, CAMP PENDLETON, CA

LOCATION EXCHANGE PROJECTS, SAN MATEO, LAS PULGAS, SAN ONOFRE, MARINE CORPS BASE, CAMP PENDLETON, CA

MARINE PALMS HOUSING PHASE IV, TWENTY-NINE PALMS, CA

MARK V WATERFRONT OPERATIONS SUPPORT FACILITY, NAVAL AIR STATION NORTH ISLAND, SAN DIEGO, CA

MARANATHA CHAPEL, RANCHO BERNARDO, CA

MURPHY CANYON WHOLEHOUSE REVITALIZATION, PHASE III, SAN DIEGO, CA

MIRA MESA/CHESTERTON/MURPHY CANYON SITES, SAN DIEGO, CA

NAVAL FACILITIES ENGINEERING COMMAND 1997 DESIGN AWARDS PROGRAM

NAVY FAMILY HOUSING PROJECT, PHASE III, IV, MOANALUA TERRACE FAMILY HOUSING, PEARL HARBOR, HI

NAVY LODGE ADDITION, NAVAL STATION, SAN DIEGO, CA

NAVY LODGE ADDITION, NAS NORTH ISLAND, CORONADO, CA

FAMILY HOUSING UNITS, OCOTILLO HEIGHTS HOUSING, MCAGCC TWENTY-NINE PALMS, CA

WHOLE HOUSE REVITALIZATION FAMILY HOUSING UNITS, NCBC, PORT HUENEME, CA

PT. MUGU NAVY FAMILY HOUSING UNITS

AMPHIBIOUS RECONNAISSANCE OPERATIONS FACILITY, MARINE CORPS BASE, CAMP PENDLETON, CA

RENOVATE BOWLING CENTER (R-411), NCBC, PORT HUENEME, CA

SAN ONOFRE WHOLE-HOUSE RENOVATIONS, PHASE IV, MARINE CORPS BASE, CAMP PENDLETON, CA

SAN ONOFRE RENOVATION PHASE II, III, CAMP PENDLETON, CA

SAN ONOFRE RENOVATION PHASE I, CAMP PENDLETON, CA

WHOLEHOUSE REVITALIZATION, FAMILY HOUSING UNITS, SHADOW MOUNTAIN, MARINE CORPS AIR GROUND COMBAT CENTER, TWENTY-NINE PALMS, CA

FAMILY HOUSING UNITS, STUART MESA HOUSING, CAMP PENDLETON, CA

REPLACE CAPEHART MILITARY FAMILY HOUSING- PHASE I, VANDENBERG AFB, CA

REPLACE CAPEHART MILITARY FAMILY HOUSING- PHASE VII, VANDENBERG AFB, CA

REPLACE CAPEHART MILITARY FAMILY HOUSING- PHASE III, VANDENBERG AFB, CA

EODMU WATERFRONT OPERATIONS FACILITY, NAVAL AMPHIBIOUS BASE, CORONADO, CA

YUMA FUND ‘68’ PHASE II

YUMA FUND ‘68’ PHASE III

YUMA FUND ‘65’ REPLACE FAMILY HOUSING PHASE I

BEQ P-015 AREA 53, CAMP PENDLETON

BEQ 13109 RENOVATION AREA 13 CAMP PENDLETON

YUMA PROVING GROUNDS FAMILY HOUSING PHASE II

YUMA PROVING GROUNDS FAMILY HOUSING PHASE I

FAMILY HOUSING REPLACEMENT PHASE II FT SILL, OKLAHOMA

FAMILY HOUSING REPLACEMENT PHASE III FT SILL, OKLAHOMA

P-038 WEIGHT HANDLING SHOP AREA 25, CAMP PENDLETON

BEQ P-440, MCAS YUMA, ARIZONA

BEQ P-014 AREA 31, CAMP PENDLETON

BEQ SAN MATEO (62) AREA, CAMP PENDLETON

BEQ P-991 22 AREA, CAMP PENDLETON

DESERT VIEW HOUSING & COMMUNITY CENTER, MCLB BARSTOW, CA

BEQ PACKAGE #1 (5 BACHELOR ENLISTED QUARTERS, CAMP PENDLETON, CA

BEQS AND ELISTED DINING FACILTY AREA 41, CAMP PENDLETON, CA

BEQ P-794V, NAVAL SUBMARINE BASE, SAN DIEGO, CA

RENOVATE BEQS 1423 & 1443 AND RENOVATE BLDG 1607, CAMP PENDLETON, CA

BEQ 53574 AREA 53, CAMP PENDLETON, CA

BEQ 53570 AREA 53, CAMP PENDLETON, CA




RENOVATION BEQ 241, POINT MUGU, FINAL Up

“An outstanding contractor all around!... The contractor’s timely performance, safety and QC should serve as a model for all NAVFAC projects…. The quality of workmanship by the contractor is exceptional… The contractor’s project management team were professional and dedicated to the project. The contractor team partnered with the Government and went out of their way to ensure customer needs were met… Contractor finished 4 months ahead of schedule!... Harper Construction Company is highly professional contractor that produces superb work. Recommended for any large construction contract.”




MUTLI-BATTALION OPERATIONS CENTERS, TWENTYNINE PALMS, FINAL Up

“Harper’s field staff was excellent to work with, very cooperative and very understanding of the short term changes by the government. They were very willing to get the work accomplished with excellence, seeing it through completion. Harper was very accommodating in trying to satisfy government requirements; and in the end it created excellent facilities. Unforeseen customer requirements were included supporting this excellent result. ”




MARINE CORPS RECRUIT DEPOT (MCRD), SAN DIEGO, FINAL Up

“Harper Construction acted as an outstanding partner with the Government, to work through the issues and arrive at win-win solutions. Harper was open and honest in its dealings with the Government providing insight into their reasoning and actions, in their effort to be a team player. Harper Construction has been a very responsive contractor… Harper Construction was not only responsive, but very proactive. Harper was quick to identify areas that would need to be addressed before they became areas-of-concern and/or before they became emergencies. Harper excelled in providing complete actionable information that helped identify issues and provided recommendations.”




BACHELOR ENLISTED QUARTERS (BEQ) PACKAGE 5, CAMP PENDLETON, FINAL Up

“Once again Harper put together an experienced quality control staff that exceeded the contract requirements… The project team conducted themselves in a very professional manner. They were familiar with the various Government processes, ie, schedules, change orders, negotiations and invoicing… Safety is at the top of the list for Harper Construction. This is another area where Harper excels above the contract requirements.”




BACHELOR ENLISTED QUARTERS (BEQ) P-1251 & P-1254, CAMP LEJEUNE, INTERIM Up

“Harper Construction has met or exceeded contract requirements for quality and workmanship. Their company mentality is to provide the customer with a quality project that is on time and within budget, which they prove on a continual basis. Their safety performance has been exemplary. Their site organization and cleanup is outstanding, which definitely contributed to the success of their safety program.”




PHASE 3 OF THE REGIMENTAL MAINTENANCE COMPLEX, AREA 43, FINAL Up

“The contractor team was very responsive and professional. They demonstrated outstanding flexibility with construction modifications and government design changes throughout the duration of the project… The contractor’s work routinely exceeded the contractual requirements and applicable code requirements in the construction of all three facilities… The contractor was incredibly proactive in the management of the three construction sites.”




RECRUIT BARRACKS P-1069, CAMP PENDLETON, FINAL Up

“The contractor design team worked seamlessly with design and construction personnel to deliver an outstanding design for facilities in a highly constrained area. Through diligent research efforts, budget transparency, and a collaborative partnering team approach, Harpers team was able to provide a net-zero (95% on-site renewable) facility in lieu of the contractually required 71% on-site renewable at no cost to the government. The system includes a cutting edge Concentrated Photovoltaic System (CPV), high efficiency flat panel PV system, geothermal ground source heat pump system, 200 kw diesel generator, four bi-directional electrical vehicle charging stations, and advanced wireless monitoring and metering controls. The design effort was a complete success, executed on-time, within budget providing a great value to NAVFAC and Camp Pendleton.”




STARSHIP BARRACK 5955 RENOVATION, FORT SILL, FINAL Up

“Harper did an excellent job of managing submittals, material acquisition, and sequencing of the work to ensure all work progressed without delay. The job was complex to manage and they dealt efficiently with a variety of unexpected conditions. Ultimately, they brought in a quality product on the originally scheduled BOD date… The job site remained exceptionally clean at all times without prompting by USACE… Superintendents remained vigilant to prevent or resolve issues from the beginning of Site Work to completion of testing of Bldg Systems… All Contractor personnel conducted business with a high degree of professionalism no conflicts required resolution at a higher level… The Contractor resolved all Subcontractor issues effectively without the assistance of USACE... Very few warranty responses requested by DPW. Harper stayed in touch with bldg occupants and response and completion or repair has normally occurred prior to notification by DPW.”




ARMED FORCES RESERVE CENTER, FORT SILL, FINAL Up

“This contractor exceeded all expectations in cooperating not only with the Corps but with the customer. They always acted on requests from our customer and rarely had to turn down a requested change. Their management made every effort to accommodate requests for changes and acted on them immediately… This contractor maintained very strict control of his subcontractors… His ability to orchestrate the work and manage his subcontractors was a very instrumental reason he completed well ahead of his schedule and with limited punch list items… The KTR team was always professional in the everyday operations and in contact with our customer. At no time did we have any complaints on professionalism of the management team nor of the workforce… This contractor always resolved subcontractor issues with no need for government intervention… This contractor never had a work delay. His management of the schedule allowed him to keep on top of the schedule and therefore resolved the delay before it happened.”




CONSTRUCT NEW AIR PASSANGER TERMINAL (P-057) AT MCAS MIRAMAR N68711-01-D-6223/0004  Up 

FINAL PERFORMANCE EVALUATION REMARKS, ROICC MIRAMAR

“Top-notch company and a pleasure to work with! Harper was always proactive and professional, anticipating issues and resolving them before they developed. They are customer focused and deliver great value for the govt’s dollar. Harper aggressively managed the schedule and finished a full month ahead of time. Always attentive to safety and quality, they had “zero” safety incidents on the job site. Required documentation was flawless and presented without delay, and management, production and QC worked together to provide the best product for the govt’s money. This project had many last-minute changes requiring significant re-design effort to satisfy an extremely demanding customer. Harper excelled in rapidly completing a quality product, significantly exceeding our standards. I unconditionally recommend Harper for award of any construction job, and would seek them out to work on any government installation. Their team is professional, productive, and easy to work with.”

INTERIM

“HCC is an Outstanding and highly professional company who has the government’s best interest at heart. There focus had been customer satisfaction in conjunction with value engineering since the kick off of design of The Air Passenger Terminal and Cargo Handling Facility. With a limited budget and no funds for formal partnering, Harper has put the effort forth that is not only enjoyable but also extremely productive in all respects.”




DESIGN-BUILD FAMILY HOUSING PROJECT, ADOBE FLATS (H-370), MARINE CORPS AIR GROUND COMBAT CENTER, TWENTY-NINE PALMS, CA N68711-99-D-6654  Up

FINAL PERFORMANCE EVALUATION REMARKS, ROICC TWENTYNINE PALMS

“It has been a pleasure to work with Harper Construction on this project. The field teamworked in a highly effective and professional manner. Their cooperation, responsiveness, and implementation of schedule and partnering requirements brought this project in ahead of schedule. The completion of the contract task order brings another housing area for our junior enlisted Marines that the command can be proud of.”

LETTER DATED 4-18-03, ROICCC TWENTYNINE PALMS

“I would like to take this opportunity to express my appreciation to your firm for a job well done on the design/build project for 73 family housing units built in the Adobe Flats area.”

“The Navy needs good responsive subcontractors and your firm is an outstanding example for other contractors to emulate. Thank you for performing in such a professional manner. It was a pleasure doing business with your company.”




ACADEMIC TRAINING FACILITY P-621, MARINE CORPS AIR GROUND COMBAT CENTER, TWENTYNINE PALMS, CA N68711-01-D-6217  Up

FINAL PERFORMANCE EVALUATION REMARKS, ROICC TWENTYNINE PALMS

“I would highly recommend Harper Construction for future government projects. The success of this project can be attributed to the outstanding project team that Harper Construction assembled. The outstanding caliber of field personnel, coupled with the solid support the field personnel received from their home office is indicative of the entire company’s understanding of government contracting, their willingness to work with the government to overcome temporary obstacles that invariable arise, both administrative as well as technical, and their vast construction acumen. In short, Harper is a top-notch contractor specifically geared toward contracting with the government and this highly effective organization and proactive corporate attitude leads directly to successful project completion.”

“In conclusion, Harper Construction has been a 1st class organization to do business with and they should be highly considered for future awards, regardless of the scope or magnitude. The success of the projects they are involved in depends not on the work at hand, but rather the team they assemble to accomplish the work. It has truly been a pleasure doing business with Harper Construction on this project.”




ARMORED VEHICLE WASH PLATFORM FINAL EVAL  Up

“I would highly recommend Harper Construction for future government projects. The success of this project is directly attributable to the Project Manager, the Project Superintendent, as well as the solid support the field personnel received from their home office. The entire company’s understanding of government contracting, their willingness to work with the government to overcome temporary obstacles, both administrative as well as technical, and their vast construction acumen are just a few of the characteristics that made this job a pleasure to execute with Harper’s staff. In conclusion, Harper Construction has been a 1st class organization to do business with and they should be highly considered for future awards, regardless of the scope or magnitude.”




YUMA AIR TRAFFIC CONTROL TOWER FINAL EVAL  Up

“Effectiveness of Management: The Superintendent proved to be real strength in the construction performance as he exhibited absolute control of all construction activities. The work coordination with subcontractors and city officials was effectively managed. OUTSTANDING. Safety Plan: The safety officer has been thorough and vigil throughout the project. New employees arriving onsite were briefed and all safety regulations enforced to the fullest. No accidents occurred throughout the performance of this project, which, by its design, entailed many potential dangers. OUTSTANDING.”




YUMA AIR TRAFFIC CONTROL TOWER INTERIM  Up

“The cooperativeness and professionalism exhibited by you and your staff, both on site and in San Diego, has been an inspiring experience. Your project manager, supervisor, quality control manager, and safety managers have been performing at an accelerated tempo and high intensity since breaking ground. We look forward to continuing this working relationship with Harper Construction.”




BEQ P-438 KANOEHE BAY, HAWAII-FINAL EVAL  Up

“This contract had extremely subsurface unforeseen conditions that could have resulted in unacceptable delays and costs. The Contractor rescheduled his work sequences to ovoid overall delays and suggested const effective ways to resolve the unforeseen.”

“Safety was paramount. This project logged over 238,000 man-hours without a single lost time accident!”

“The customer, Director of UEPH for MCBH, has described this project as ‘the best UEPH in the entire U.S. Marine Corps.’”




ENGINEERING SVC CTR PORT HUENEME FINAL EVAL  Up

“The contract was completed ahead of schedule with a high degree of quality.

“Harper Construction displayed a high degree of professionalism and went out of their way to delight the customer.”

“Correct safety precautions were always observed to the point that there were 102,466 man-hours of work without one lost time incident. Punchlist items and warranty work were handled in a prompt and correct fashion. The ROICC was extremely pleased with the organization, efficiency and high quality of work performed by Harper Construction on this project and highly recommends them for any similar type project in the future.”




BAE SYSTEMS   Up

“The management team at Harper is straight forward and reasonable, as you would expect from people ho have a team player philosophy. When there are difficult issues to address as there always are in large construction projects, you can trust what they say. I believe the high quality of their work is a result of correct internal systems to maintain quality and properly staffing their work with experienced, knowledgeable people.”




BEQ P-044, AREA 13, CAMP PENDLETON  Up

Naval Facilities Engineering Command 2004 Safety Award




BEQ P-074 CAMP PENDLETON  Up

“The contractor’s management team has shown the utmost level of professionalism in its dealings with the Government. During negotiations, the project manager is courteous and professional and agrees to costs/credits that are fair and reasonable to all parties involved.”

“From the beginning of this contract, the Quality Control manager has thoroughly implemented, maintained and enforced all aspects of the QC Plan. The management of his inspection team and documentation is outstanding. The contractor created a working team of knowledgeable professionals that have either eliminated or resolved all quality control problems.” The contractor practices excellent management techniques and provides experienced personnel as they relate to the project’s labor and materials. In effect, this advanced planning has kept the contractor ahead of schedule. The contractor has demonstrated advanced flawless coordination in preventing any. The site personnel are doing an outstanding job coordinating and controlling the subcontractors. The contract’s management team has shown the utmost level of professionalism in its dealings with the Government.”




BEQ P-410/415 MCAS YUMA, INTERIM  Up

“Harper is performing superbly in many areas. They have an outstanding on site staff and object manager. Harper is great to work with and the Navy and Marine Corps will benefit by continuing to work with Harper on future projects.”




BEQ P555 SAN CLEMENTE ISLAND, FINAL EVALUATION  Up

“The resourceful and knowledgeable on-site project team did an outstanding job planning and overcoming the logistical challenges involved with doing construction on San Clemente Island. Contractor was sensitive to Navy operations and worked diligently to satisfy the needs of the Navy and the client. ROICC Coronado highly recommends the contractor for future work.”




BEQ & DINING FACILITY P-707, SAN CLEMENTE ISLAND, FINAL EVAL  Up

“Overall quality of work was excellent. Jobsite supervision and management were outstanding. Harper is a very capable contractor and does quality work. ROICC Coronado recommends this contractor for future work.”




BEQ Del Mar Site, MCB Camp Pendleton, CA  Up

“Their advance planning keeps them well ahead of material and personnel bottlenecks, which has allowed them to exceed their approved schedule.”

“The turn-over from the contractor’s design team to the construction team was fairly seamless, owed primarily to the professionalism of the personnel.”




Child Development Center, Fort Irwin, CA  Up

“Outstanding ability to keep multiple projects going at the same time.”

“Outstanding communication led to objective management verses crisis management of issues.”

“Design-build project, on track, on price, on time.”




Child Development Center, San Onofre, Marine Corps Base, Camp Pendleton, CA  Up

“Throughout the entire performance period, the contractor performed both the design and construction of the subject contract in an exemplary manner. The contractor provided Outstanding Workmanship, Quality Control, Effective Management, and Timely Performance throughout the duration of the performance period.”




Naval Construction Training Center, Port Hueneme, CA  Up

“The Harper Construction team excellently managed their resources and subcontractors, allowing them to deliver a final product more than one month in advance.”




Family Housing Project, Phase I, II, III, Hale Moku, Pearl Harbor, Oahu, HI  Up

“(Harper Construction) produced a quality product well ahead of scheduled completion date. The overall project was nothing less than OUTSTANDING. The efforts (Harper Construction) on this project are commendable. This project was touted through the entire chain of command at NAVFAC as a model for future housing construction projects.”

“The high quality workmanship, timely completion, and excellent cooperation displayed by your personnel brought credit to your organization as well as my contract administration team at the Resident Officer in Charge of Construction, Pearl Harbor. You consistently met or exceeded the standards established by the contract in all items of work, resulting in an excellent product at final inspection. Moreover, your professionalism and willingness to get the job done were clearly beyond normal contractual expectations.”

“(Harper Construction) produced a product beyond expectation. The contractor got a conglomeration of 516 units in multi-plex buildings built pre-World War 2, with severe structural damage, asbestos, lead paint, no climate control and on-street parking. They gave back quality homes with modern conveniences including air-conditioning, built in appliances and attached garages. They shaped the neighborhood in this design build contract through master planning to include parks, landscaping, irrigation systems and a community center. They are one of the most efficient and aggressive contractors I’ve worked with. They were sensitive to noise levels, site cleanliness, and safety. Their construction phasing plan greatly reduced the severe housing shortage. The quality of materials routinely exceeded contract requirements. I look forward to working with (Harper Construction) on future projects.”




From the State of California, Dept of Industrial Relations Cal/OSHA Consultation Service, Fresno, CA   Up

Golden Gate Partnership Recognition

Dear Mr. Danner,

Congratulations, your company has been recognized by the Cal/OSHA Consultation Service for its effort in implementing and maintaining an effective injury and illness prevention program during the Cal/OSHA Consultation Service visit on January 24, 2003.

Golden Gate Recognition was developed to provide motivation and support to employers who proactively work with their employee and the Cal/OSHA Consultation Service. During our consultative visit to your company, your managers and employees demonstrated a commitment to continuously improve the effectiveness of its workplace safely and health management system. This commitment to workplace safety and health is being commended by the Cal/OSHA Consultation Service. Thank you for actively participating in occupational safety and health in your workplace.

Sincerely,

Jim Lopes, Area Manager and David Gee, Safely Consultant




Indoor Fitness Center, MCB, Camp Pendleton, CA  Up

“This facility (Indoor Fitness Center) is the largest in the Marine Corps. This facility has been published in several trade magazines for the unique construction methods. Harper Construction Company has done an outstanding job in constructing this facility.”

“Harper has earned an overall rating of Outstanding. The Harper project team has displayed enthusiasm, professionalism and dedication throughout construction. Their can-do attitude has helped resolve issues in the field prior to them becoming serious roadblocks.”

“The Harper project team is proactive, professional and responsive in meeting the Government’s needs. An excellent working relationship has developed between the Government and Contractor team members.”




Location Exchange Projects, San Mateo, Las Pulgas, San Onofre, Marine Corps Base, Camp Pendleton, CA  Up

“The workmanship exceeded the quality typically encountered on our contracts.”




Marine Palms Housing Phase IV, Twenty-nine Palms, CA  Up

“It was a pleasure to have worked with such a professional and responsive Harper Construction team. Their implementation of a high quality product with the ability to resolve various problems is a credit to their company and the government process. I look forward to working with Harper Construction again.”




Mark V Waterfront Operations Support Facility, Naval Air Station North Island, San Diego, CA  Up

“Harper put together a team for this project that excelled in all aspects of construction. Overall, Contractor performed outstandingly on this challenging project in delivering a high quality facility to the user.”




Maranatha Chapel, Rancho Bernardo, CA  Up

“Exceeded our expectations. We received more than we expected for the contract price.”




Murphy Canyon Wholehouse Revitalization, Phase III, San Diego, CA  Up

“They delivered to the Navy the best product, highest quality, on time and within a defined budget project. I would highly recommend Harper as an excellent choice for any type of work involving construction, design/build, architectural/engineering, and project management services.”

“Contractor exceeded (government) expectations.”




Mira Mesa/Chesterton/Murphy Canyon Sites, San Diego, CA  Up

“Harper did an outstanding job completing housing units at 2 different sites and a housing office at a 3rd site. The Harper staff and CQC were extremely professional and dedicated to the job.”




Naval Facilities Engineering Command 1997 Design Awards Program  Up

Merit Award in Large Scale Development

Presented to (Harper Construction) “In recognition of high levels of excellence in their design of the Mira Mesa and Chesterton Family Housing Areas in California, May 12, 1997.” (Rear Admiral, CEC, USN Commander, Naval Facilities Engineering Command)




Navy Family Housing Project, Phase III, IV, Moanalua Terrace Family Housing, Pearl Harbor, HI  Up

“Certificate of Appreciation: The truly outstanding performance on this significant project is a reflection of the professionalism and integrity of your project management staff. The success with which the project was executed brings great credit upon your organization. My personal congratulations to the entire organizationfor a job well done.” - C.R. KUBIC, Rear Admiral Civil Engineer Corps, U.S. Navy, Commander




Navy Lodge Addition, Naval Station, San Diego, CA  Up

“The overall end result is a very functional, cost effective, and visually pleasing structure. The customer’s Project Manager is extremely pleased with the final product.”




Navy Lodge Addition, NAS North Island, Coronado, CA  Up

“I would recommend Harper Construction very highly to any future projects they would undertake.”




Family Housing Units, Ocotillo Heights Housing, MCAGCC Twenty-nine Palms, CA  Up

“(Harper Construction’s) Quality Control program was the best I’ve seen. (Harper Construction) is an outstanding contractor overall.”




Whole House Revitalization Family Housing Units, NCBC, Port Hueneme, CA  Up

“It was a pleasure working with you on this project and I would highly recommend you for future complex and challenging projects of any magnitude or complexity.”




Pt. Mugu NAVY Family Housing Units  Up

“Harper kept an impeccable safety record with zero accidents and a “safety first” mentality that all workers on site projected. Harper’s own initiative to perform above the standard construction practice in the field and in the administrative area created a working environment that allowed work to progress and solutions to real problems more acceptable.”




Amphibious Reconnaissance Operations Facility, Marine Corps Base, Camp Pendleton, CA   Up

“This team of experienced professionals exemplified proactiveness, responsive cooperation, and partnering spirit with the NAVFAC Field Office, Camp Pendleton in meeting the needs of the customer. I commend you for your performance.”

“Harper Construction rating is overall outstanding. The project was completed four months ahead of the CCD of May 14, 2005. This was accomplished by maintaining a safe job site and complying with all contract requirements, laws and regulations.”




Renovate Bowling Center (R-411), NCBC, Port Hueneme, CA  Up

“The ROICC was pleased with their quality of work and recommends them for any similar type projects in the future.”




San Onofre Whole-House Renovations, Phase IV, Marine Corps Base, Camp Pendleton, CA  Up

“(Harper) was required to comply with federal, state, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oil substances, and noise pollution. They complied with all of these requirements. This resulted in a final product that pleased Base Housing.”

“Harper Construction Company Inc. has earned an “Outstanding” final performance evaluation for this project. During this project (Harper Construction) has gone out of their way to partner with the Government Project Team. They worked well with the Government to overcome the numerous funding challenges encountered. The Base Housing Department was extremely pleased with (Harper Construction’s) final product.”




San Onofre Renovation Phase II, III, Camp Pendleton, CA  Up

“This team of experienced professionals exemplified proactiveness, responsive cooperation, and partnering spirit with the NAVFAC Field Office in meeting the needs of the customer. The Government commends you on your performance.”

“The marines and sailors moving in were very impressed with their houses and the overall neighborhood that appeared new. This was the most important accomplishment of HNDB, although this project was revitalization, they were able to compete and turn over units that appeared to be brand new!”




San Onofre Renovation Phase I, Camp Pendleton, CA  Up

“Your performance establishes you as one of our highest performing contractorsIt was truly a pleasure to work with your firm and subcontractors on this project.”




Wholehouse Revitalization, Family Housing Units, Shadow Mountain, Marine Corps Air Ground Combat Center, Twenty-nine Palms, CA  Up

“Harper is an excellent contractor who goes above and beyond what is required to meet the needs of the customer. Their flexibility and willingness to compromise are outstanding. Harper is an overall outstanding contractor.”




Family Housing Units, Stuart Mesa Housing, Camp Pendleton, CA  Up

“The project superintendent was successful and cooperative in organizing on site management and the work of subcontractors.”




Replace Capehart Military Family Housing- Phase I, Vandenberg AFB, CA  Up

“Harper is highly respected, highly knowledgeable and a truly professional contractor that goes out of their way to provide the government a quality product at a reasonable price.”




Replace Capehart Military Family Housing- Phase VII, Vandenberg AFB, CA  Up

“Harper is a customer service focused organization, dedicated to providing a quality product in a timely manner. They were highly responsive to all of our needs as well as helpful in providing suggestions to improve their project, whether it was finishing the design-build package or constructing the homes in this particular housing project. We have no doubt that Harper will continue to be a highly successful contractor and would eagerly recommend them for future projects.”

“No reportable safety issues or accident in over five years of construction at Vandenberg. Conducts safety briefing on a regular basisManagement staff and base senior leaders consider the family housing to be outstanding. Numerous visitors including both senators from the state of California; two chief of staffs of the air force; the current chairman of the joint chiefs of staff; over fifteen four star generals; civilian leadersI regard this firm to be the best design/construction company doing military family housing today.”




Replace Capehart Military Family Housing- Phase III, Vandenberg AFB, CA  Up

“The performance of Harper in the execution of its work is unsurpassed on this base as is evidenced by the glowing comments we receive from visiting dignitaries including senators, congressional representatives and four star generals. Comments always include that this is no doubt the best housing constructed in the air force if not in the department of defense. This contractor can be recommended for any additional work of this type without hesitation and we eagerly anticipate his return.”




EODMU Waterfront Operations Facility, Naval Amphibious Base, Coronado, CA  Up

“Workmanship was excellent during the construction phase of the contract, thanks in large part to the contractor’s outstanding Quality Control Program, Quality Control Manager, and Site Superintendent. All were far superior to the industry standard. There were no lost time accidents on the project. The contractor delivered a truly outstanding facility to a very demanding client. ROICC Coronado highly recommends Harper Construction for future work.”




Yuma Fund ‘68’ Phase II  Up

“Outstanding work!!”




Yuma Fund ‘68’ Phase III  Up

“Overall work Outstanding.”




Yuma Fund ‘65’ Replace Family Housing Phase I  Up

“Outstanding work!!”




BEQ P-015 AREA 53, CAMP PENDLETON  Up

“Harper Construction has taken that extra step to make the Marines at the new 53 area BEQ as comfortable with that at home feeling. The activity center and the laundry combined has given the Marines the ease to relax when doing laundry and at the same time watching the three big screen TVs, playing pool or utilizing the complete kitchen.

The Contractor worked extremely well with all the different base personnel associated with the project. Contractor was responsive to the Government’s requests. The contract approached the project with a partnering attitude, followed the chain of command and worked well with the Government team assigned to the project.

From the first day of work the SSHO followed the plan to the letter.

The project had (0) lost time incidents.”




BEQ 13109 RENOVATION AREA 13 CAMP PENDLETON  Up

INTERIM:

“The Contractor has been outstanding in their performance, management and implementation of the project. They are cooperative and focused on customer satisfaction. The project is on schedule and within budget. The contractor has been proactive with suggestions and recommendations to improve the project. The current Outstanding performance evaluation is well deserved.”

FINAL:

“It is this evaluator’s opinion that the Contractor went above and beyond what would be reasonably expected, and that the level of cooperation observed in this project is the best he’s seen in his 20-year career. This Contractor is highly recommended.”




yuma proving grounds family housing phase ii  Up

“The Straub/Harper team again performed superbly on this project. They were selected for this project in part for their outstanding performance on the FY05 Housing Project, and proceeded seamlessly into the new phase. Again, they delivered the project two months ahead of schedule. They continued their exceptional safety program and again had no lost time injuries on the job.”




yuma proving grounds family housing phase i  Up

“The Straub/Harper team performed superbly on this project. They provided the project to the customer almost 3 months ahead of schedule, with many of the units turned over for beneficial occupancy and physical occupancy even sooner. At the same time, they scheduled the construction so as to suit the desires and needs of the Installation. The Installation Staff has boasted to others that these units are ‘the best housing in the Army.’ They received an outstanding (3.8 out of 4) safety evaluation by the District Safety Office Inspection Team, and had zero lost time injuries. Change orders and construction issues were dealt with in a cooperative, timely, and professional manner. Punch list, as-built drawings, and final documentation were provided so expeditiously that this project will be the fastest project close-out for this office on record.”




FAMILY HOUSING REPLACEMENT PHase ii FT SILL, OKLAHOMA  Up

“Harper Construction’s performance on this project has positively changed the landscape for this installation. Their team established a working environment which fostered open communication and cooperation. This was evidenced by the teamwork displayed and coordination among the subcontractors on an everyday basis. The responsiveness on this project was excellent and embodied the spirit of partnering.”




FAMILY HOUSING REPLACEMENT PHASE III FT SILL, OKLAHOMA  Up

“The Management went out of their way to assist when asked and excelled in its ability to manage the resources available to it. They proved their ability to manage the work and personnel by




P-038 weight handling shop area 25, camp pendleton  Up

 

Harper Construction Company earned an Outstanding on this contract by working with Government personnel to quickly resolve the many construction issues which accrued during the construction of this contract.  The Contractors team working together with foresight and experience pointed out many design and potential construction problems early to the Government so the Government team had time to resolve them before they impacted the construction progress.  This team work allowed the construction project to be completed on time.

 

Harper Construction performed over 41,566 hours of work without any lost time accidents or incidents.




BEQ P-440, MCAS YUMA, ARIZONA  Up

 

An added advantage in construction was due to Harpers foresight by including the eventual quality control manager into the design process to induce familiarity and limit unexpected conditions during construction.

 

The subcontractors for this project were masterfully scheduled by the QC and Superintendent according to proper sequence; this effort eliminated project impediments that would have resulted in site demolition, rework and lost time.  Harper performed a superior job in management of the project resources and personnel.

 

This project suffered no lost time due to accidents.  The safety implements for this project met the requirements outlined in EM 385 1-1 from start to finish.  The safety officer was constantly examining the jobsite and the various work specific precautions taken to avoid accidents.  The safety officer was very responsive when hazards were identified by others and his level of sensitivity to safety kept a potentially dangerous project site from realizing those hazards.




BEQ P-014 area 31, camp pendleton  Up

 

The Contractors final performance evaluation reflects an OUTSTANDING rating.  The contractors quality control, effectiveness of management, timely performance, compliance with labor and safety standards were exceptional.

 

The Contractor personnel deserve to be commended for their outstanding support in making sure that this design-build project was completed ahead of schedule with ZERO safety incidents.

 

SAFETY COMMENDATION LETTER:

I am pleased to inform you that your company is hereby awarded this Safety Commendation Letter for your exemplary performance in the area of construction safety on the jobsite for the above subject contract.




BEQ san mateo (62) area, camp pendleton  Up

 

For this project, Harper Construction has earned a Final overall rating of Outstanding.

 

The overall quality of the workmanship on this contract has been outstanding.  There have been very few issues of quality brought to the Governments attention, and for those that were, they had solutions at hand.




BEQ p-991 22 area, camp pendleton  Up

 

Harpers project team was a highly effective construction team that performed admirably throughout the entire contract duration.

 

The team encountered various design and unforeseen challenges, yet resolved these issues in any impressive manner and to the delight of the ROICC and base customers.

 

Harper has done an outstanding job with safety compliance.

 

In conclusion, Harper Construction, their subs/suppliers, and their project team as a whole, performed in an outstanding manner on this project.  No LTAs were encountered, no non-compliances, within our budget and completed ahead of schedule.  Harper is well deserving of an overall OUTSTANDING final evaluation of this project.




DESERT VIEW HOUSING & COMMUNITY CENTER, MCLB BARSTOW, CA  Up

 

Outstanding contractor.  This $25M housing MILCON project was completed within budget and ahead of schedule, and without any mishaps.  Contractor handled all issues that developed during construction with a cooperative spirit and in a professional manner.  For the outstanding safety record under this project, Harper Construction Company will be presented with a STAR award.  I would highly recommend this contractor for any future contracts with NAVFAC-SW.




beq pACKAGE #1 (5 BACHELOR ENLISTED QUARTERS, CAMP PENDLETON, CA  Up

 

The work on this project is of high quality.

 

The Harper management staff is very professional and effective in administering this highly visible and fast pace project.  The staff is very responsive and accommodating to the customers need and the project schedule.  Harper has excellent control of their subcontractors.

 

Harper has a top notch safety program on all 5 of the BEQ sites.




BEQS AND ELISTED DINING FACILTY AREA 41, CAMP PENDLETON, CA  Up

 

The Contractor has cooperated with the Government and was professional and courteous at all times.  The Contractor has been responsive to Governments requests, at times going above and beyond the call.  The Contractor has a genuine partnering attitude and works well with all Government personnel.

 

The Contractor partnered with the ROICC to resolve delays timely and as efficiently as possible.  Early site work required the Contractor to edit the logic of his work to avoid costly delays associated with a Government conflict.  The Contractors expertise and willingness to partner helped the Government avoid substantial delay costs.

 



beq p-794v, naval submarine base, san diego, ca  Up

 

The project was completed 6 months ahead of schedule and included state of the art fire protection and notification features that were upgraded after the award.




renovate beqs 1423 & 1443 and renovate bldg 1607, camp pendleton, ca  Up

 

The Contractor manages to perform an outstanding job and delivered a good product plus meeting the requirement of the specs.  Recommend that the Contractor should be used again for the similar type of projects.  In addition, the project went smoothly in are of safety, and there was zero safety incident during the project.  Job well done!




beq 53574 area 53, camp pendleton, ca  Up

 

The Contractors performance and professionalism has been consistently excellent across the board on this contract, and I highly recommend them.

 

Construction was managed expertly with an excellent QC and Safety program.  Any safety concerns raised by the Government were addressed promptly, and Contractor was proactive in mitigating risk by constantly monitoring its safety controls and those of its subcontractors.

 

The attitude and effectiveness of the management team has resulted in a quality project delivery three months ahead of schedule.  Though this was a renovation project, I believe the product delivered was of a much higher quality in all aspects than when the building was originally built.




beq 53570 area 53, camp pendleton, ca  Up

 

The Contractors performance on this contract has been truly exceptional.

 

In conjunction with the Government, the design team was highly successful in providing extra quality-of-life amenities within the contract budget as well as taking a comprehensive approach to the design and engineering of the building.

 

The project is on track for completion three months ahead of schedule.